Deck replacement from the footings up

Troy's original decks are aging out. Thirty to fifty Michigan winters will do that. We tear the old structure out completely and rebuild to current code, footings first.

Why replace

Why rebuild instead of patching again?

Repair fixes boards. Replacement fixes structure. When rot reaches the framing, posts, or ledger, patching buys a season at best, so we pull the whole deck and start over from new footings. On a deck built decades ago, that is usually the honest call, and we say so on site.

Rot ends at the frame

Once posts, joists, or the ledger go soft, no board swap saves it. The structure gets rebuilt.

Footings below frost

Old shallow piers heave a little more every winter. New piers bear 42 inches down, on undisturbed soil.

Guards built to code

36-inch height, openings that stop a 4-inch sphere, even stair risers. Decks from the 1970s rarely have any of it.

A ledger done right

Bolted with structural hardware and flashed with metal, so water never rots the band joist behind it.

Disposal by the book

Old treated lumber is landfill-bound under Michigan rules. It never gets burned, and never chipped into mulch.

One crew, one job

Demolition, haul-off, footings, framing, decking, guards, and both city inspections, handled start to finish.

How does a full tear-out work?

Four stages, two city inspections. Here is the sequence a replacement actually follows, from the first probe to the final sign-off.

1

Assess and scope

We probe posts, joists, and the ledger with an awl, measure the site, and put the full scope in writing.

2

Demolition and haul-off

The old deck comes out completely, old footings included where they interfere with the new layout. Debris goes straight to a facility that takes construction waste.

3

Footings and framing

New piers dug to 42 inches and inspected before the pour. Then framing, a bolted and flashed ledger, and hold-down hardware.

4

Decking and sign-off

Boards, guards, and stairs go on, the city runs its final inspection, and the deck is yours for the next few decades.

Weathered deck boards with deep cracks and popped fasteners Carpenter assembling a wooden porch railing section on sawhorses
TROYSecond cycle

Rebuilding decks across Troy's original subdivisions

Most Troy decks that come down were built with the houses. 59% of the city's homes went up between 1960 and 1989, across subdivisions like Sylvan Glen, Northfield Hills, and Mount Vernon Estates, so original decks and plenty of first replacements are now 30 to 50 years old. What ages out is structural: posts on shallow footings that freeze-thaw winters have heaved, guardrails and stairs cut to pre-code geometry, ledger attachments that predate modern hardware rules. We tear the whole structure out, send the old lumber to licensed facilities, and rebuild from new 42-inch frost-depth footings to code-current framing, decking, guards, and stairs. Repair covers surfaces. Rot in the frame means replacement.

  • Sylvan Glen
  • Northfield Hills
  • Mount Vernon Estates
  • Frost-heaved footings
  • Pre-code guardrails
  • Wood-to-composite swaps

The rebuild, in numbers

42 in.Frost depth every new footing reaches
1960-1989When 59% of Troy homes were built
40 psfLive load decks are designed to carry
25 psfOakland County ground snow load
4 in.Sphere no guard opening may pass
HOW EVERY REBUILD RUNS

Footings below frost

Every new pier bears 42 inches down

Ledgers bolted, flashed

Structural fasteners and metal flashing, never nails

Permits pulled, inspected

Footing check before pour, final at the end

Haul-off handled

Old treated lumber landfilled, never burned or chipped

Service Area

Deck builders across Oakland County

The same second-cycle housing stock runs past the city line into Rochester Hills and Clawson, and those decks age exactly the same way. We run the identical tear-out-and-rebuild process, permits and inspections included, across the neighboring Oakland County suburbs.

Troy Rochester Hills Rochester Auburn Hills Bloomfield Hills Bloomfield Township Birmingham Royal Oak Clawson Madison Heights Warren Sylvan Glen Emerald Lakes Village Beach Forest Raintree Village Somerset North Northfield Hills Troy Meadows
Straight answers

Replacement questions Troy homeowners ask

Where the damage sits decides it. Cupped or split boards over a sound frame are a repair or resurface job. Rot or movement in the framing, support posts, or ledger means replacement, because a patched structural member fails again. We probe with an awl and tell you which side you're on.
Almost always, yes. The city exempts only small detached platforms: not exceeding 200 square feet, under 30 inches, not within 36 inches of the house, and not serving a door. An attached replacement needs a permit, a footing inspection before the pour, and a final. We handle all of it.
It goes to a licensed landfill that accepts construction debris. Decks built before 2004 are usually CCA-treated, and Michigan EGLE bars open burning of construction debris and treated wood outright. Never burn old deck boards in a fire pit, and never chip them into mulch.
Usually not, and you would not want us to. Most older decks here sit on shallow piers that decades of freeze-thaw have already heaved out of level. New footings dug to the 42-inch frost line are what keep the next deck flat for the long haul.
Permit plan review commonly runs one to three weeks, and that is the long pole. Once the permit is in hand, demolition takes a day or two, and most rebuilds wrap within a couple of weeks after that, inspections included, weather permitting. We schedule demolition only once the permit is approved.
It runs close to new-build pricing plus demolition and disposal, and size, material, railing footage, and stair count drive it. We publish per-square-foot ranges on our deck building and composite decking pages, and a written quote for your exact deck costs nothing.
Yes, that is half the point. The current Michigan Residential Code requires 36-inch guards with openings that stop a 4-inch sphere, even stair risers, a bolted and flashed ledger, and lateral hold-downs rated at 1,500 pounds. Your new deck gets inspected against all of it.
It is the cheapest moment you will ever have to switch. The frame is built new anyway, so we set joist spacing for composite from the start, 16 inches on center, 12 for diagonal layouts. See our composite decking page for the material rundown and the board lines we install.

Retire the old deck this season

Build season in Troy runs April through October, and permit review eats weeks of it. The sooner we probe your framing, the sooner the rebuild starts. The quote itself costs nothing.

(947) 218-7948
Mon-Sat 8am-6pm, Troy and nearby
Call Now
Call (947) 218-7948