Home
Deck Building Deck Replacement Composite Decking Deck Repair Deck Staining & Sealing Three-Season Rooms & Screened Porches
About FAQ Contact Call (947) 218-7948
House porch mid-rebuild with angled shoring braces and caution tape

A New Deck, Built From the Footings Up

Custom decks for Troy homes, engineered from the ground down: 42-inch frost-depth piers, through-bolted ledgers, and a permit file the Building Department can approve without a second round.

Why clear your HOA before the permit?

Because the city says to. Troy officially recommends confirming neighborhood association approval before starting decks, fences, patios, and additions, and it publishes a directory of active associations, dozens of them. A building permit satisfies the city; it does not override private covenants recorded on your subdivision.

Association reviews vary, but most weigh the same four things: decking material, color, overall height, and setbacks from the lot line. Subdivisions like Beach Forest, Somerset North, and Stoneridge each keep their own association, so the standard next door may not be the standard on your street.

We fold the step into the schedule instead of bolting it on. Association drawings go out while the boundary survey and plot plan come together, so HOA sign-off and the permit application land in the same window and nobody loses a build slot waiting.

Why Us

Built for Troy's frost line and inspectors

Because a deck is a six-part chain: footings, posts, beams, joists, ledger, decking. We build every link to the current Michigan Residential Code, design for Oakland County's 25 psf ground snow load and 40 psf live load, then let the city's inspectors check our work.

Footings below the frost line

Piers bear 42 inches below grade on undisturbed soil, so freeze-thaw cycles cannot heave an attached deck.

Ledgers done to code

Minimum 2x8, through-bolted to the band joist, flashed against water, and never hung on brick veneer.

Lateral hold-downs installed

Rated 1,500-pound tension hardware ties the deck frame back into the house so it cannot pull away sideways.

Hardware that survives treated wood

Modern preservatives corrode cheap steel. We spec hot-dip galvanized or stainless fasteners with matching connectors throughout.

Permits filed for you

Signed application, scaled plot plan from your boundary survey, emailed to the city's Building Department. We manage the file.

HOA approval handled early

The city recommends clearing deck plans with your neighborhood association first. We build that step into the schedule.

What happens after you call?

A short call, a site visit, a written quote, then a permitted build. Here is the sequence for a new deck in Oakland County.

1

Site visit and design

We measure, check grades and setbacks, talk materials and railing footage, and sketch a deck that fits the lot.

2

Approvals and permit

HOA drawings go out while we prepare the signed application and scaled plot plan for the Building Department email submittal.

3

Footings and frame

We dig to 42 inches, pass the open-hole inspection, pour, then frame the load path and call the framing inspection.

4

Decking and final

Boards go down gapped for the material, guards and stairs go in to code, and the final inspection closes the permit.

Bid Check

The corner-cut bid against a code-current build

What gets builtThe corner-cut bidCode-current build
Footing depthDug to a guess, above frost42 inches below grade, inspected
Ledger attachmentNailed to the house, no flashingThrough-bolted, flashed, off brick veneer
Fastener metalBare or electro-galvanized steelHot-dip galvanized or stainless
PermitSkipped, surfaces at resalePulled, both inspections passed
Board gappingOne gap for every boardSet by material and moisture
Built-in bench with cushions and an umbrella on a modern deck Kettle grill flaming on a deck seen through an open doorway
TROYBuilt Local

One build standard from Beach Forest to Stoneridge

Custom deck construction in Troy starts underground. Footings go 42 inches below grade because southeast Michigan freeze-thaw will heave anything shallower. The load path runs in order: footings, posts, beams, joists, ledger, decking and guards, each link built to the current Michigan Residential Code. The ledger gets the most care: a 2x8 minimum, through-bolted rather than nailed, flashed so water never reaches the band joist, kept off brick veneer, with 1,500-pound lateral hold-downs tying frame to house. We design, permit, and build custom wood and composite decks across Troy, from ground-level platforms to raised multi-level structures with stairs and code-compliant guards. The permit file goes to the Building Department by email; we prepare it.

  • 42-inch frost footings
  • Through-bolted ledgers
  • Lateral hold-downs
  • Hot-dip galvanized hardware
  • Permit file prepared
  • HOA step scheduled
Service Area

Deck builders across Oakland County

Custom deck construction runs beyond the Troy city line. The same footing depth, ledger detail, and permit discipline travel to Rochester Hills, Birmingham, and neighboring Oakland County suburbs. Every city keeps its own permit desk, and we file to match it.

Troy Rochester Hills Rochester Auburn Hills Bloomfield Hills Bloomfield Township Birmingham Royal Oak Clawson Madison Heights Warren Sylvan Glen Emerald Lakes Village Beach Forest Raintree Village Somerset North Northfield Hills Troy Meadows
Deck Questions

Straight answers for Troy homeowners

Almost always, yes. The only exemption is a detached platform not exceeding 200 square feet, under 30 inches above grade, not within 36 inches of the house, and not serving a door. Anything attached, taller, or serving a door needs a permit, inspections included.
By email to the Building Department, not through the online portal. BSAonline covers roofing, windows, and siding only. A deck submittal needs a signed permit application plus a plot plan drawn to scale from an accurate boundary survey. We prepare and send that package.
Pressure-treated decks in Troy typically run $25-$45 per square foot installed, with site conditions, railing footage, and stairs moving jobs within that band. Railing surprises people most; the linear footage of rail, not the deck area, drives that line. A written quote pins it down.
Yes. Michigan law requires anyone paid to build, alter, or repair a residential structure, decks included, to hold a state residential builder licence, and an unlicensed builder cannot sue in Michigan courts to collect payment for that work. That is state law, worth knowing before signing any deck contract.
Check before you design. The city recommends confirming neighborhood association approval ahead of deck work and publishes an official directory of associations. Covenants can govern material, color, and height, so we send drawings to the association while the permit package comes together.
42 inches below grade, the frost depth for Michigan. Shallower piers heave when the ground freezes, and on an attached deck that movement transfers straight into the house framing. The city inspects the open holes before any concrete gets poured.
Roughly April through October, once frost leaves the ground and footing digs are practical. Winter is the smart time to design and permit; plan review commonly takes one to three weeks, so a January start puts you first in line for spring.
Two ways: nailed-only attachment and missing flashing. Nails lack the shear capacity the load demands, and an unflashed ledger rots the band joist behind it. We through-bolt a 2x8 minimum ledger, flash it, keep it off brick veneer, and add rated lateral hold-downs.

Build season in Troy fills up fast

Footings cannot be dug through frozen ground, so the calendar does the scheduling. Call now, get a written quote, and hold a spring build slot before the thaw rush.

(947) 218-7948
Mon-Sat 8am-6pm, Troy and nearby
Call Now
Call (947) 218-7948